Dig an open trench, and you'd rip up the street and the buildings along it.
- So you go underneath, with a tunnel boring machine. Disc cutters crack the rock, and scrapers peel away the soil.
- But soft ground caves in, and the street above starts to sink.
- So the soil you dig is packed into a sealed chamber that pushes back on the ground ahead.
- But to move forward, you need something to push against.
- So hydraulic rams brace on the lining you've already built, with thousands of tonnes of force.
- And an erector arm locks curved concrete segments into a ring, and grout fills the gap behind it.
Ring by ring, the tunnel grows, and up on the street, nobody even notices.